Clean Car | Construction Update

  • Writer: Customer Care
    Customer Care
  • May 14, 2020
  • 1 min read

WV Car Wash

  • Crews divided 2 went out to work on vacuum lines

  • 1 worked on putting hoses together

  • 2 worked on tank room

BM Manny

  • They came down for only grid ceiling

BM Chewie

  • Did some drywall patching and started the tunnel wall 1 sided with plywood

Norman Electric

  • Aided Waterloo public works in getting building power and worked in tank room along with vending room and bathrooms

Hirsch

  • Had to drive for missing parts of the boiler setup and water lines

The electric side of public works.

  • Hooks up transformer to lines. And removed the temp power

  • Building has power